![Canadian Consulting Engineer](https://www.canadianconsultingengineer.com/wp-content/uploads/2021/07/CCE-eProduct-logos-2021.png)
Features
Buildings
August 1, 2012
August 1, 2012
Buildings: Top Performers at Okanagan
Buildings
August 1, 2012
August 1, 2012
Building HVAC & Controls: Trouble Shooting
Buildings
August 1, 2012
August 1, 2012
Buildings: Prairie Vision
Companies & People
August 1, 2012
August 1, 2012
Engineers & the Law: All for One?
Advertisement
Stories continue below
Buildings
August 1, 2012
August 1, 2012
PRODUCTS
Buildings
August 1, 2012
August 1, 2012
Up Front
Buildings
August 1, 2012
August 1, 2012
Comment: Building Operators need support
Companies & People
June 1, 2012
June 1, 2012
Company News Round-Up: CCI Group, DEC Engineering, Geo-nergie, Southern Comfort Mechanical, Associated Engineering
Buildings Energy
June 1, 2012
June 1, 2012
Products
![Ryan Williams (at right) on site with two members of the design team. Mount Lebanon is visible in the background.](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/06/1001627820-1001627831-300x167.jpg)
Business & Professional
June 1, 2012
June 1, 2012
The Human Edge: Designing a World of Hope
Buildings Water & Wastewater
June 1, 2012
June 1, 2012
Computer Products
Buildings Companies & People
June 1, 2012
June 1, 2012
Software – Retooled
Business & Professional Companies & People
June 1, 2012
June 1, 2012
Young Professionals and Managing “Up”
Business & Professional
June 1, 2012
June 1, 2012
Employment: Subtle Messages
Water & Wastewater
June 1, 2012
June 1, 2012
Sharing the Load
![Glenmore Trail/Legsby Road Pedestrian Bridge spans 53 metres over a multiple-lane arterial road in southwest Calgary.](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/06/1001627793-1001627795-300x201.jpg)
Transportation
June 1, 2012
June 1, 2012
Two Pedestrian Bridges
![Freda Leong (centre) checking out a geothermal water source on Gitwinksihlkw lands in B.C.](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/06/1001627790-1001627792-300x225.jpg)
Water & Wastewater
June 1, 2012
June 1, 2012
Let the Waters Flow
![Site components of the West Don Lands Stormwater Treament Facility and Storm Outfall project, Toronto.](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/06/1001627763-1001627765-300x231.jpg)
Environmental Water & Wastewater
June 1, 2012
June 1, 2012
Going Beyond: West Don Lands Stormwater Treatment Facility and Storm Outfall Project
![Telus Garden Development Vancouver](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/06/1001627760-1001627762-300x279.jpg)
Transportation
June 1, 2012
June 1, 2012
Up Front
Water & Wastewater
June 1, 2012
June 1, 2012
Comment – First Nations still struggle with inadequate infrastructure
Companies & People
June 1, 2012
June 1, 2012
Contents, June-July 2012
Energy
May 1, 2012
May 1, 2012
Renewables need solid government support
Companies & People Energy
May 1, 2012
May 1, 2012
Per Drewes – a Photovoltaics Pioneer
Companies & People
May 1, 2012
May 1, 2012
Quiet Please!
Energy
May 1, 2012
May 1, 2012
New Products
![The Sir Adam Beck Generating Station near Niagara Falls, Ontario has a pumped power facility dating from 1957. It is visible in the photo to the left of the reservoir, behind the concrete penstocks in the foreground. Image courtesy Ontario Power Generation.](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/05/1001498780-1001498782-300x188.jpg)
Energy
May 1, 2012
May 1, 2012
Pumped Power – Future Hope?
Energy
May 1, 2012
May 1, 2012
Rooftop Leasing Hazards
Buildings Energy
May 1, 2012
May 1, 2012
Photovoltaics: Feeling FIT
Buildings
May 1, 2012
May 1, 2012
Recommissioning – a Practical Tool
![Exterior of the building at night.](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/05/1001498544-1001498546-300x199.jpg)
Buildings
May 1, 2012
May 1, 2012
Symbol of Sustainability
![The 78,110-m2 distribution centre supplies IKEA storesin a 1,000-km radius.](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/05/1001498271-1001498272-300x225.jpg)
Buildings
May 1, 2012
May 1, 2012
Retrofit for IKEA
![The building has "freezer" type steel skinned polystyrene walls an dis raised 1.5 metres above grade to control snowdrifts.](https://www.canadianconsultingengineer.com/wp-content/uploads/2012/05/1001498269-1001498270-300x200.jpg)
Buildings
May 1, 2012