![Canadian Consulting Engineer](https://www.canadianconsultingengineer.com/wp-content/uploads/2021/07/CCE-eProduct-logos-2021.png)
Features
![Generac Power Systems](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/05/75534-48703.jpg)
Engineering
May 1, 2005
May 1, 2005
Fire & Security Products
![In 2007, the Public Bridge Authority at Buffalo and Fort Erie will proudly open the new Canadian Plaza at the Peace Bridge border crossing. The complex has several components, including a vehicle toll collection facility, an administration building for Peace Bridge management and staff, a Canada Border Services Agency inspection building, refugee processing centre and a vehicle compound. Central to the design of the Plaza and the buildings themselves is the very purpose for which the buildings exist -- security of persons and state. Giffels Associates is designing the information systems for NORR, prime consultant.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/05/75530-48700-300x148.jpg)
Engineering
May 1, 2005
May 1, 2005
Arresting the Demons
Engineering
May 1, 2005
May 1, 2005
Security Systems Come of Age
![Simon Fraser University's Advanced Mobile Emergency Communications Research Vehicle.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/05/75489-48685.jpg)
Engineering
May 1, 2005
May 1, 2005
Security News
Advertisement
Stories continue below
![Changes in the 2005 Building Code of Canada will affect the structural design of tall buildings in seismically active urban centres like Montreal.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/05/75479-48680-300x200.jpg)
Engineering
May 1, 2005
May 1, 2005
Fire News
![](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/05/75524-48699-300x195.jpg)
Engineering
May 1, 2005
May 1, 2005
Sprinklers and Condominiums
![firestopping (in red) of blank sections in a research facility using fireblocks made with intumescent material. All images courtesy Hilti except where otherwise noted.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/05/75521-48693-224x300.jpg)
Engineering
May 1, 2005
May 1, 2005
Firestop Systems
Engineering
May 1, 2005
May 1, 2005
MasterFormat 2004 and Building Services
![Stan Rohner/iStockphoto](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/05/75508-48690-199x300.jpg)
Engineering
May 1, 2005
May 1, 2005
Electrical Equipment in Hazardous Locations
![View from Canada Place where the Port Authority command centre is located.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/05/75501-48686-300x224.jpg)
Engineering
May 1, 2005
May 1, 2005
Vancouver’s Wired Port
![](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/67972-43410.jpg)
Engineering
April 1, 2005
April 1, 2005
Engineers should be testing themselves
Engineering
April 1, 2005
April 1, 2005
Commons Committee includes ACEC recommendations in report
![Left to right: Dale Craig, ACEC Vice-Chair, the Honourable John Godfrey, PC, Minister of State (Infrastructure), Allen Williams, ACEC Chairman, and Claude Paul Boivin, ACEC President.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/67993-43419-300x245.jpg)
Engineering
April 1, 2005
April 1, 2005
ACEC meets Infrastructure Minister
Engineering
April 1, 2005
April 1, 2005
La durabilit… une question long terme
![Erecting "The Big Frock"](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68157-43412-225x300.jpg)
Engineering
April 1, 2005
April 1, 2005
What’s New… (April 01, 2005)
Engineering
April 1, 2005
April 1, 2005
Personal Investments
Engineering
April 1, 2005
April 1, 2005
Motivation
Engineering
April 1, 2005
April 1, 2005
Criminal Charges
![Honourable Shawn Murphy, Parliamentary Secretary to the Minister of Fisheries and Oceans.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/67992-43418-257x300.jpg)
Engineering
April 1, 2005
April 1, 2005
The Department of Fisheries and Ocean’s Modernization Plan: From Vision to Implementation
![Jamieson high on the slopes.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68235-43482-264x300.jpg)
Engineering
April 1, 2005
April 1, 2005
Snow Man
![](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68201-43446-300x200.jpg)
Engineering
April 1, 2005
April 1, 2005
A Testing Time
![atrium facing southwest; its double wall system tempers the heating and cooling loads.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68197-43440-300x225.jpg)
Engineering
April 1, 2005
April 1, 2005
NRC Aluminum Technology Centre
![Second 5 MW turbine added four years after the first had established a track record.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68183-43431-300x295.jpg)
Engineering
April 1, 2005
April 1, 2005
York University Cogeneration Plant
Engineering
April 1, 2005
April 1, 2005
Exergy
![Process diagram of the Alholmens Kraft biofuelled power plant in Finland.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68173-43422-300x169.jpg)
Engineering
April 1, 2005
April 1, 2005
Cogeneration — Makes Sense
![Desk illumination levels were tested by participants in a simulated office. Personal preferences varied widely.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68104-43454-300x138.jpg)
Engineering
April 1, 2005
April 1, 2005
Open-Plan Offices
![An imaginary scene painted by portrait artist John Lucas depicting "a meeting of the engineers involved in Robert Stephenson's Britannia Bridge." Stephenson is seated at centre and Alexander M. Ross is standing on the extreme right of the painting. Seated in front of Ross is the legendary Victorian engineer, Isambard Kingdom Brunel. Image reproduced by permission of the Institution of Civil Engineers.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68213-43451-300x226.jpg)
Engineering
April 1, 2005
April 1, 2005
Professional Rivalry
![](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/67988-43417-240x300.jpg)
Engineering
April 1, 2005
April 1, 2005
ACEC scores government relations victories
![Patient Court between the fourth and eighth floors in the new Clinical Services Building. Air movement is carefully orchestrated.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/04/68190-43434-294x300.jpg)
Engineering
April 1, 2005
April 1, 2005
Toronto General Hospital Redevelopment
![Baillie in Egypt for the BBC television series "Building the Impossible."](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/01/60478-38247-225x300.jpg)
Engineering
January 1, 2005
January 1, 2005
A Bubbling Brain
Engineering
January 1, 2005
January 1, 2005
Water and Profits: Is There a Catch?
![Whitemud Creek Arch on the Anthony Henday Drive southwest extension in Edmonton.](https://www.canadianconsultingengineer.com/wp-content/uploads/2005/01/60435-38210-300x225.jpg)
Engineering
January 1, 2005